SECURITY
– Perimeter fencing / hoarding is to be secure (heras panels to be erected to manufacturer instructions or temporary works design)
– Entrance ways / gates are to be locked
– Key(s) to entrances, stores areas and site cabins are to be kept with the nominated key holder
SCAFFOLD
– Scaffold boards are to be secured to prevent displacement
– ALL materials are to be removed from the scaffold
– Monoflex / Debris Netting is to be securely tied to scaffold
– Scaffold is to be inspected immediately prior to site closure
– Ladders used for accessing scaffold are to be removed and stored securely
– ALL mobile / alloy towers are to be dismantled and secured (or off hired and removed from site)
HOUSEKEEPING
– Site is to be tidy and cleared of ALL rubbish
– ALL skips are to be removed from site for the duration of the shutdown period
– Materials that are left on site are to be secure and stacked in a stable condition
– Access / egress routes are to be kept clear and free from obstruction
EXCAVATIONS / GROUNDWORKS
– Where possible ALL open excavations / groundworks are to be backfilled prior to shutdown
– If unable to backfill – area is to have suitable barriers / edge protection in place
– Shallow excavations are to be covered where possible / suitable battered
– Deep excavations are to be suitably shored – and inspected prior to site closure
PLANT / VEHICLES
– ALL plant is to be removed from site for the duration of the shutdown period
(unless this has been cleared through the Operations Manager / Director)
– Any plant remaining on site is to be immobilised and secured (screens fitted where able) to prevent access
– Any plant remaining on site is to be parked on level ground away from the perimeter fence
FUELS / OILS & FLAMMABLES
– Any diesel left on site must be contained within a secured, water tight, rigid bund
(100%> of volume stored)
– Drums must be secure / stable to that cannot fall over
– Flammable substances are to be removed from site (Petrol, LPG, Butane, Oxyacetylene etc.)
– Filling appliances / hoses are to be securely stored to prevent unauthorised use
SERVICES
– Water systems are to be drained down to prevent damage through burst pipes
– Temporary supplies to site is to be isolated at the stopcock
– ALL mains supplies (Gas & Electric) is to be turned off at meter – except where lighting / illumination is essential
MISCELLANEOUS
– ALL small tools are to be secured in a lockable container / chest
– A copy of the Public Notice is to be correctly displayed at the site entrance